一区二区三区高清无码,青娱乐国产视频1000,国产69精品久久久熟女,无码精品中文影视

<br />
<b>Warning</b>:  Use of undefined constant wp_title - assumed 'wp_title' (this will throw an Error in a future version of PHP) in <b>/www/wwwroot/m.aesgtork.cn/wp-content/themes/onii/header-pc.php</b> on line <b>27</b><br />

安裝說明VIEWS

SHA型可調(diào)阻尼彈簧減震器安裝說明


來源:http://m.aesgtork.cn/1360.html 發(fā)布于:2019-06-24 03:07   瀏覽:5,468

SHA型可調(diào)阻尼彈簧減震器安裝說明
SHA?spring isolator installation guide

安裝前,請(qǐng)確認(rèn)淞江集團(tuán)彈簧減震器的型號(hào)和規(guī)格是否正確。
Before installation,make sure the model and the specification are correct.
安裝說明
Installation guide
所需工具:公制口徑17mm(M10)、19mm(M12)開口扳手、爪式千斤.。
Required tools:17mm(M10)、19mm(M12)open wrenches and claw jack.
可先放置與彈簧減震器高度相同的臨時(shí)木塊與設(shè)備安裝處,再安裝設(shè)備。(如圖1)
Place the wooden panel with the same height as the isolator at the installation before installing.(Fig 1)
先將固定螺栓的上部螺帽取下,再放松下部的螺母使全牙螺栓下降,以方便將彈簧減震器放入安裝位置。(如圖2)
Rrmove the upper nuts from the fixed bolt.Loosen the lower nuts to descend the full-thread bolt to install the isolator.(Fig 2)
根據(jù)螺栓固定孔的位置,與安裝位置預(yù)埋基礎(chǔ)螺栓。
Embed foundation bolt according to the location of bolt-loaded holes.
將彈簧減震器放置到與設(shè)備的正確安裝位置。(如圖3)
Place the isolator on the correct installation location.(Fig 3)

SHA型可調(diào)阻尼彈簧減震器安裝說明

SHA型彈簧減震器結(jié)構(gòu)圖:
SHA Spring shock absorber Structure drawing
SHA型可調(diào)阻尼彈簧減震器安裝說明

型號(hào)/規(guī)格 L
(mm)
L1
(mm)
L2
(mm)
L3
(mm)
H
(mm)
D
(mm)
M
(mm)
SHA-S 153 123 105 71 120 12 12
SHA-M 178 135 117 76 135 12 14
SHA-L 209 175 1152 88 160 16 16

調(diào)整下部螺母使全牙螺栓上升至與設(shè)備安裝處,并將上部螺母與全牙螺栓鎖緊。(如圖4)
Adjust lower nuts to raise the full-thread bolt for the installation and slightly lock the upper nuts and full-thread bolt.(Fig 4)
使用開口扳手以順時(shí)針方向調(diào)整螺母使彈簧受力下壓,調(diào)整至臨時(shí)木臺(tái)可取出時(shí)停止調(diào)整。(如圖5)
Apply open wrench in the clockwise direction to press down the spring. Adjustment can be stopped and wooden panel can be removed once you can take out thepressure pad.(Fig 5)
將固定螺栓確保完全鎖緊,即完成淞江集團(tuán)彈簧減震器安裝調(diào)整。(如圖6)
After the adjustment,lock the isolator with fixed bolt.(Fig 6)
安裝后請(qǐng)檢查彈簧下壓量,如彈簧壓到底,則表示荷重不足,沒有減震效果。應(yīng)該更換較大荷重的彈簧減震器型號(hào),并請(qǐng)于本公司業(yè)務(wù)人員聯(lián)系。
After the adjustment,check the press amount of the spring.If it appears with insufficient loading,please replace with bigger loading by contacting our staff.
安裝時(shí) 請(qǐng)注意安全。
Be cautious during the installation.

保養(yǎng)須知:每月要觀察CS固定螺栓是否有松動(dòng),保持彈簧減震器安裝時(shí)彈簧下壓撓度是否正常。
Maintenance checking points:remain M12 fixed bolt locked,balance of the base,installation of the isolator,and the deflection of the spring.

圖1)安裝設(shè)備時(shí)先放置與彈簧減震器高度相同的木臺(tái)。
Fig 1)Pace the wooden panel with the same height as the isolator at the installation before installing.
SHA型可調(diào)阻尼彈簧減震器安裝說明

圖2)固定螺栓的上部螺帽先取下來,再把下部螺帽松掉使螺栓下降,以便安裝。
Fig 2)Remove the upper nuts from the fixed bolt.Loosen the lower nuts to descend the bolt for the installation.
SHA型可調(diào)阻尼彈簧減震器安裝說明

圖3)將淞江集團(tuán)彈簧減震器放入設(shè)備的安裝底部位置。
Fig 3)Place the isolator on the correct installation location.
SHA型可調(diào)阻尼彈簧減震器安裝說明

圖4)調(diào)整下部螺帽使螺栓上升至能與設(shè)備連接,再將固定螺帽鎖緊。
Fig 4)Adjust lower nuts to raise the bolt to connect with the equipment and slightly lock the fixed nuts.
SHA型可調(diào)阻尼彈簧減震器安裝說明

圖5)用開口扳手以順時(shí)針方向調(diào)整螺帽,調(diào)整*臨時(shí)木臺(tái)可以取出時(shí)即可停止調(diào)整。
Fig 5)Apply open wrench in the clockwise direction to adjust the nuts.Adjustment can be stopped once wooden panel is removed.
SHA型可調(diào)阻尼彈簧減震器安裝說明

圖6)將固定螺栓與設(shè)備完全鎖緊后,即完成淞江集團(tuán)彈簧減震器安裝調(diào)整。
Fig 6)After the adjustment,lock the isolator with fixed bolt.
SHA型可調(diào)阻尼彈簧減震器安裝說明

點(diǎn)擊下載:SHA型可調(diào)阻尼彈簧減震器安裝說明










最新推薦:
  • ·【車間*角】金屬軟管專用法蘭車床加工現(xiàn)場(chǎng)
  • ·【貴州天生橋水電站項(xiàng)目】橡膠接頭合同
  • ·橡膠接頭在模塊化冷站中的作用
  • ·【加強(qiáng)型】DN250x200變徑橡膠接頭
  • ·【山西高義鋼廠一期燒結(jié)機(jī)脫硫】同心異徑橡膠接頭
  • ·上海淞江為某閥門廠配套DN1000橡膠接頭發(fā)貨現(xiàn)場(chǎng)
  • ·【樣冊(cè)P60】特殊型橡膠膨脹節(jié) 304 316 PVC PTFE FKM
  • ·熱烈慶祝上海淞江減震器集團(tuán)南通有限公司成立
  • ·【NG】K16S-125橡膠避震喉“液壓系統(tǒng)”
  • ·社會(huì)保險(xiǎn)登記證書